Maximised results of the application waterproofing

August 24, 2008 by Design  
Filed under Interior, News, Tips

waterproofingSo that the application waterproofing optimal..!! The material waterproofing has dipiih that was appropriate and quality good. To get good results optimally giving waterproofing must be true. The stages that must be carried out that is:
1. Ascertain the surface of the field (the substrate) that will be given by the layer waterproofing clean from dust and oil. For the substrate just cleaned him could by using the hand of the soft wire was followed by cleaning dust that adhered. Whereas to the long substrate that has dcat beforehand, then the layer of the paint for a long time must in screamed first
2. The substrate must be dry and not fragile. The fragile plaster substrate must be improved first by making plaster new and in mixed with bonding agent (the adhesive) Read more

Did you like this? Share it: