Maximised results of the application waterproofing
August 24, 2008 at 6:52 am
So that the application waterproofing optimal..!! The material waterproofing has dipiih that was appropriate and quality good. To get good results optimally giving waterproofing must be true. The stages that must be carried out that is:
1. Ascertain the surface of the field (the substrate) that will be given by the layer waterproofing clean from dust and oil. For the substrate just cleaned him could by using the hand of the soft wire was followed by cleaning dust that adhered. Whereas to the long substrate that has dcat beforehand, then the layer of the paint for a long time must in screamed first
2. The substrate must be dry and not fragile. The fragile plaster substrate must be improved first by making plaster new and in mixed with bonding agent (the adhesive)
3. After the clean surface, the material waterproofing could in applied, must be paid attention to better should not apply waterproofing to the too hot substrate ayau the condition for the intense heat weather. Be waiting until air to be somewhat calm. The substrate that terlau hot could be spattered water but not until wet
4. The method of applying him could follow the guidance yag was included in the package of the product
5. Giving waterproofing better be carried out by 2 reform times. Penyapua the two with the contradictory direction. Carried out after the first application has been dry enough (around 4 hours)
6. The application of this waterproof material could use brushed or the roll
7. The substrate field that was functioning as the water cross-section, like the bath could be used 24 hours after the application
Congratulations tried